<nav id="ooo0o"><sup id="ooo0o"></sup></nav>
<noscript id="ooo0o"></noscript>
    • <tfoot id="ooo0o"><dd id="ooo0o"></dd></tfoot><nav id="ooo0o"></nav>
      
      
    • <tfoot id="ooo0o"><dd id="ooo0o"></dd></tfoot>
    • 成人免费ā片在线观看,国产亚洲日韩在线播放更多,青草青草久热国产精品,欧美不卡一区二区三区

      How to use electric sintering furnace correctly?

      2021-11-29 1653

        1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

        2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

        3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

        4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

        5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

        6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

        7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

        8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

        9: Release the pressure at room temperature, rush in the air and take out the raw materials.

        10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

        11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

        Article from:http://www.candybus.com.cn

      主站蜘蛛池模板: 理论片午午伦夜理片久久| 乱码午夜-极国产极内射| 夜夜爽夜夜叫夜夜高潮| 九九久久精品免费观看| 国产中文欧美日韩在线| 日韩a片无码一区二区五区电影 | 国产精品亚洲а∨无码播放麻豆| 国内露脸少妇精品视频| a级毛片毛片免费观看久潮| 日韩精品毛片| 国产成人无码a在线观看不卡| 好想被狂躁无码视频在线字幕| 欧美成人免费一区二区| 9l国产精品久久久久尤物| 日韩大乳视频中文字幕| 亚洲国产成人无码影片在线播放| 亚洲国产精品自在在线观看| 国产精品hd在线播放| 在线观看的黄网| 免费观看性欧美大片无片| 巨胸美乳无码人妻视频| 亚洲国产初高中生女av| 西西人体午夜大胆无码视频 | 依依成人精品无v国产| 99999久久久久久亚洲| 欧洲免费无码视频在线| 久久精品亚洲中文字幕乱码| 国产又黄又爽又色的免费| 婷婷四虎东京热无码群交双飞视频| 亚洲无码高清一区| 久久青草热| www国产精品内射老师| 亚洲的天堂av无码| 亚洲精品片911| 亚洲а∨天堂2019在线无码| 婷婷综合缴情亚洲狠狠| 国产成人精品一区二区秒拍1o| 亚洲欧美日韩在线不卡| 亚洲婷婷五月综合狠狠爱| 久久人体视频| 国产成人福利美女观看视频|